3.3 INSTALLATION
A. Install reflective insulation/radiant barrier material in accordance with drawing details and manufacturer's installation instructions.
B. Maintain minimum 3 inches (76 mm) distance from heat- producing devices such as furnaces, chimneys, blowers, and lighting fixtures.
C. Maintain minimum 3/4 inch (19 mm) air space each side of reflective insulation/radiant barrier material. NOTE ** The following schedule will assist in identifying locations where Astro-Foil is to be used on the project; it lists the most common applications of the product. Delete inapplicable sub-paragraphs and add other locations as required; consult the dealer for additional uses.
3.4 SCHEDULES
A. Locations: 1. Over roof trusses/rafters, encapsulated (RIS). 2. Over roof trusses/rafters, exposed (RBS)(RIS). 3. Interior side of wall studs/furring, exposed (RBS)(RIS). 4. Interior side of wall studs/furring, encapsulated (RIS). 5. Underside of floor joists/trusses, exposed (RBS)(RIS). 6. Underside of floor joists/trusses, encapsulated (RIS). 7. Underside of first floor joist/trusses at crawl spaces, exposed (RBS)(RIS). 8. Below interior ceiling joists/trusses/rafters,exposed (RBS)(RIS). 9. Below interior ceiling joists/trusses/rafters, encapsulated (RIS). 9. Over metal roof purlins, exposed (RBS)(RIS). 10. Over metal roof purlins, encapsulated (RIS). 11. Exterior side of metal wall purlins, encapsulated (RIS). 12. Interior side of upward-acting sectional doors, exposed (RBS). 13. Wrap HVAC supply ducts, exposed (RIS)(RBS). 14. Wrap water heaters, exposed (RIS)(RBS). 15. Wrap water supply piping, exposed (RIS)(RBS).
END OF SECTION
|
|